A Contractor should always take the contract with breakup as Land Development Works and Civil and RCC Works, which have advantage w.r.t to amending the change order and tracking the schedule.
M/s. ARK Builders Hyderabad where i worked has adopted this module and succeeded in getting advantage over schedule and cost.

Where as another contractor whom i worked M/s Navya Constructions -Vizag has met with huge loss in initial stage working in slanty terrain for a pretty project by taking earthwork/land development works along with Civil and RCC Works and lost huge money [almost 10% loss] and TIME overrun which mounts a pressure on the working team in spite of best efforts posted in project.

and we need to read the BOQ w.r.t specification where in it was written the measurement shall be done only in PCC line, and there was very much level differences in single floor, and we got only upto 5% of the work measured where as we have to do mass excavation to proceed / progress the works in this terrain.   

No comments: